Skip to content

Non-urban water metering · regional NSW

Water meters and telemetry by a registered DQP

If you take water under a licence, NSW rules now need many works to have a meter that reports its own readings. I fit the meter, the LID (the logger that reads it) and the telemetry that sends the readings in, as a duly qualified person (DQP) registered with WaterNSW.

Key dates
  • 1 December 2026: coastal works of 100 ML or more need a pattern-approved meter, a LID and telemetry.
  • 30 June 2027: Murray-Darling Basin cashback of up to $2,000 per LID when you hire your own DQP, for LIDs installed by this date or until the funding runs out. Coastal works are not eligible.

Not sure which applies to your work? See the questions below, or ask.

Meter telemetryMeter · LID · DAS
012847METERLIDSEALED LOGGERNSW DASDATA ACQUISITIONREADING RECEIVED
No manual reportingIllustrative

What I do

Your meter, LID and telemetry in one visit

For irrigators, farms and water users across the Canberra region, the South Coast and inland NSW. Training in radio telemetry and SCADA means a site with poor coverage is planned around, not a surprise.

  • Meter

    Meter installation

    A pattern-approved meter installed and tested to the NSW installation test plan, so it is ready for the LID and for validation.

  • LID + telemetry

    Logger (LID) and telemetry

    The local intelligence device (LID) fitted to your meter, sealed with tamper-evident seals and set up to report to the NSW data acquisition service, with the signal checked on site first.

  • Paperwork

    Records and certificates

    The DQP records lodged through the WaterNSW DQP Portal, with a copy for you.

  • Support

    Fault finding

    An existing meter or LID that has stopped reporting checked and brought back online.

Process

Four steps, one site visit

  1. 01

    Tell me about the work

    Your work approval or water access licence (WAL) number, the meter make and model if there is one, and where the site is.

  2. 02

    Check before travel

    Mobile or satellite coverage at the meter, and what is already on site: meter, LID, pipe work and power.

  3. 03

    Site visit

    Meter, LID and telemetry fitted, configured, sealed and tested while I am there.

  4. 04

    Lodged and handed over

    Records lodged on the portal, and a short written summary for you.

Questions

Water meters and telemetry: common questions

What is a duly qualified person (DQP)?

Under the NSW non-urban metering rules, only a DQP registered with WaterNSW may install, validate or maintain metering equipment on a licensed water work. Each DQP is registered for particular parts of that equipment.

What is a local intelligence device (LID)?

A small logger connected to your meter. It records the meter reading and, where telemetry is required, sends it to the government data acquisition service so you do not have to report by hand.

Can you install the meter as well as the LID?

Yes. I am registered to install meters as well as LIDs and telemetry, so one visit can cover both. Cutting into or changing the pipe work and mains electrical work are other trades; I can work alongside your plumber so the visits line up.

Does my work need telemetry, and by when?

It depends on the size of your work and where it is. On the coast, works of 100 ML or more need a pattern-approved meter, a LID and telemetry by 1 December 2026. Check your own work on the NSW non-urban metering pages, or send me the details and I will look it up with you.

Is there any funding?

In the NSW Murray-Darling Basin, the Telemetry Uplift Program offers a cashback of up to $2,000 per LID when you hire your own DQP, for LIDs installed to 30 June 2027 or until the funding runs out. Coastal users are not eligible. Check the current terms on the NSW water pages before you rely on it.

The rules themselves are on theNSW non-urban metering pages.

Need a meter installed or a LID set up?